Skip to content

chore(deps): bump erb from 4.0.4 to 4.0.4.1 - #162

Closed
dependabot[bot] wants to merge 1 commit into
masterfrom
dependabot/bundler/erb-4.0.4.1
Closed

chore(deps): bump erb from 4.0.4 to 4.0.4.1#162
dependabot[bot] wants to merge 1 commit into
masterfrom
dependabot/bundler/erb-4.0.4.1

chore(deps): bump erb from 4.0.4 to 4.0.4.1

7a236ec
Select commit
Loading
Failed to load commit list.
coqbot-app / GitLab CI job almalinux-9-master (pull request) completed Apr 24, 2026 in 0s

Test has failed on GitLab CI

This job is allowed to fail.

We show below the last 40 lines of the trace from GitLab (the complete trace is available here).

Details

2026-04-24T15:47:32.154728Z 01O               ----------
2026-04-24T15:47:32.154731Z 01O               pid:
2026-04-24T15:47:32.154733Z 01O                   1274
2026-04-24T15:47:32.154736Z 01O               retcode:
2026-04-24T15:47:32.154758Z 01O                   0
2026-04-24T15:47:32.154769Z 01O               stderr:
2026-04-24T15:47:32.154771Z 01O               stdout:
2026-04-24T15:47:32.154851Z 01O        ----------
2026-04-24T15:47:32.154971Z 01O                  ID: postfix-init-service-running-postfix
2026-04-24T15:47:32.155089Z 01O            Function: service.running
2026-04-24T15:47:32.155226Z 01O                Name: postfix
2026-04-24T15:47:32.155366Z 01O              Result: True
2026-04-24T15:47:32.155607Z 01O             Comment: Service postfix has been enabled, and is in the desired state
2026-04-24T15:47:32.155686Z 01O             Started: 15:47:31.499866
2026-04-24T15:47:32.155803Z 01O            Duration: 213.197 ms
2026-04-24T15:47:32.155920Z 01O             Changes:   
2026-04-24T15:47:32.155966Z 01O               ----------
2026-04-24T15:47:32.156081Z 01O               postfix:
2026-04-24T15:47:32.156216Z 01O                   True
2026-04-24T15:47:32.156925Z 01O        
2026-04-24T15:47:32.157034Z 01O        Summary for local
2026-04-24T15:47:32.157157Z 01O        -------------
2026-04-24T15:47:32.157267Z 01O        Succeeded: 29 (changed=28)
2026-04-24T15:47:32.157408Z 01O        Failed:     2
2026-04-24T15:47:32.157557Z 01O        -------------
2026-04-24T15:47:32.157646Z 01O        Total states run:     31
2026-04-24T15:47:32.157974Z 01O        Total run time:    9.588 s
2026-04-24T15:47:32.513186Z 01E >>>>>> ------Exception-------
2026-04-24T15:47:32.513191Z 01E >>>>>> Class: Kitchen::ActionFailed
2026-04-24T15:47:32.513192Z 01E >>>>>> Message: 1 actions failed.
2026-04-24T15:47:32.513192Z 01E >>>>>>     Converge failed on instance <default-almalinux-9-master>.  Please see .kitchen/logs/default-almalinux-9-master.log for more details
2026-04-24T15:47:32.513193Z 01E >>>>>> ----------------------
2026-04-24T15:47:32.513194Z 01E >>>>>> Please see .kitchen/logs/kitchen.log for more details
2026-04-24T15:47:32.513194Z 01E >>>>>> Also try running `kitchen diagnose --all` for configuration
2026-04-24T15:47:32.742675Z 00O 
2026-04-24T15:47:32.742681Z 00O+
2026-04-24T15:47:32.743457Z 00O+Cleaning up project directory and file based variables
2026-04-24T15:47:33.366136Z 00O 
2026-04-24T15:47:33.366140Z 00O+
2026-04-24T15:47:36.623893Z 00O ERROR: Job failed: exit code 1