Skip to content

Upstream

Upstream #2159

Triggered via schedule January 29, 2026 03:24
Status Failure
Total duration 51s
Artifacts

upstream.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (3.10)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
The operation was canceled.