Skip to content

build, doc: move to redesign #85370

build, doc: move to redesign

build, doc: move to redesign #85370

Triggered via pull request May 17, 2026 13:20
Status Cancelled
Total duration 1m 33s
Artifacts

test-linux.yml

on: pull_request
Matrix: test-linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test-linux (ubuntu-24.04)
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
test-linux (ubuntu-24.04)
The operation was canceled.
Test Linux
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
test-linux (ubuntu-24.04-arm)
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
test-linux (ubuntu-24.04-arm)
The operation was canceled.