Skip to content

build, doc: move to redesign #85369

build, doc: move to redesign

build, doc: move to redesign #85369

Triggered via pull request May 17, 2026 13:18
Status Cancelled
Total duration 2m 1s
Artifacts

test-linux.yml

on: pull_request
Matrix: test-linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 notices
test-linux (ubuntu-24.04)
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
test-linux (ubuntu-24.04)
The operation was canceled.
test-linux (ubuntu-24.04-arm)
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
test-linux (ubuntu-24.04-arm)
The operation was canceled.
Test Linux
Canceling since a higher priority waiting request for Test Linux-doc/redesign exists
sccache stats - test-linux
77% - 243 hits, 74 misses, 0 errors
sccache stats - test-linux
79% - 77 hits, 21 misses, 0 errors