Skip to content

Merge pull request #58 from lilt/Regenerate-open-api-bindings #3

Merge pull request #58 from lilt/Regenerate-open-api-bindings

Merge pull request #58 from lilt/Regenerate-open-api-bindings #3

Triggered via push June 4, 2025 17:30
Status Failure
Total duration 26s
Artifacts

python.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 1.
build (3.13)
Process completed with exit code 1.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
Process completed with exit code 2.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed