Upgrade doc dependencies (#220) #262
testing-and-deployment.yml
on: push
Matrix: Build and Testing
Upload release to PyPI
0s
Annotations
9 errors
|
Build and Testing (3.14)
Process completed with exit code 1.
|
|
Build and Testing (3.13)
The strategy configuration was canceled because "unit_testing._3_14" failed
|
|
Build and Testing (3.13)
Process completed with exit code 1.
|
|
Build and Testing (3.10)
The strategy configuration was canceled because "unit_testing._3_14" failed
|
|
Build and Testing (3.10)
Process completed with exit code 1.
|
|
Build and Testing (3.11)
The strategy configuration was canceled because "unit_testing._3_14" failed
|
|
Build and Testing (3.11)
The operation was canceled.
|
|
Build and Testing (3.12)
The strategy configuration was canceled because "unit_testing._3_14" failed
|
|
Build and Testing (3.12)
The operation was canceled.
|