Skip to content

AOB-WS6 IBM upstream PR package #6

Description

@eggrollofchaos

Scope

Package the Team 13 fork work into one or more maintainer-readable PRs against IBM/AssetOpsBench.

Current Cut cadence

Default to one first IBM upstream Cut PR unless Dhaval/IBM asks for a different split. This PR should be the smallest package that is still runnable/reviewable as a Smart Grid AssetOpsBench contribution:

This should be opened before the 2026-05-07 15:00 ET class presentation if the deck claims that an upstream AssetOpsBench PR has been opened. It is not a NeurIPS-paper blocker unless the paper claims the upstream PR exists.

Why not a scenarios-only first PR?

A literal scenario-only PR is thinner, but not independently useful for IBM upstream because upstream does not yet have the Smart Grid domain/tools those scenarios exercise. The practical thin PR is therefore domain + data policy + 36 scenarios + IEC/DGA tests, while excluding the heavier research/runner surfaces below.

Later / Full-path PRs

Keep these separate unless IBM requests a combined contribution:

  • 50+ scenario corpus expansion and generated-scenario validation.
  • Evaluation adapter / judge parity after the IBM evaluation-module direction settles.
  • Generator-assisted scenario pipeline and provenance tooling.
  • L3/statistical-fidelity validator.
  • Agent-as-Tool orchestration runners and MCP batch-mode integration.

Exclusions from the first PR

Do not include class-only assets: notebooks, raw benchmark captures, W&B/dashboard polish, report/deck text, personal/team coordination docs, Insomnia/GCP runbooks, or private planning artifacts.

Acceptance

  • First IBM upstream PR URL is opened and linked here.
  • PR body lists shipped domain surfaces, tests run, excluded class artifacts, and data/provenance requirements such as SG_DATA_DIR.
  • AOB Project items and HPML EAMLite API filters are not working IBM/AssetOpsBench#46 are updated with the upstream PR URL and any deferred follow-on PRs.

Metadata

Metadata

Labels

aob-upstreamSmartGridBench work intended for AOB fork/upstream integrationphase-4-upstream-prAOB extraction Phase 4: upstream PR packagingworkstream-parentParent issue used to group child tasks in the project board

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions